It is hard to believe that we're about to start our 6-month of construction. The building is taking shape, particularly at level 1. The light blue rigid insulation (check out the pictures!) has been installed at the concrete walls. The classroom walls have all been framed with metal studs and the electrician is installing the conduit for the light fixtures. We're finalizing the layout for the radiant heating and cooling ceiling panels and the holes have been cut in the steel beams for the ductwork. We plan to fireproof the beams early next week.

We're framing level two walls and cutting holes in the concrete floor slab for the radiant panel pipe penetrations. The Central Hall space is quickly taking shape with the stair installation from level 1 to level 2.

The mechanical subcontractor is installing ductwork and piping in the attic space, filling up most of the space in the trusses. Framing will follow in the next few weeks.

Please come back soon to check out the progress!